PREVIOUS PROJECTS

No.: Year: Description: Project Details: Client: Location:
83 2009 Design and Construct Overland Conveyor System 4km/800t/h D&Z Griffin Energy
82 2008 Design and Fabricate Iron Ore Processing Plant MGM Extension Hill
81 2007 Design and Construct Radial Stacker (160m/7500t/h) Worley Parsons Cloud Break
80 2006 Design and Construct Conveyor System Placement Plant KHD Blue Circle Southern
79 2005 Construct Drum and cyclone plant Kerman C.L. Bootu Creek
78 2005 Supply and Construct Crushing and screening plant c/w conveyor system Kerman C.L. Bootu Creek
77 2005 Design and Construct 1500 t/h stacker/ship loader with yard conveyor Bootu Creek Darwin
76 2004 Design and Construct 1000 t/h storage & ship loading conveyor system Wylie&Skene Port Hedland
75 2004 Supply Conveyor system for waste recycling plant GRD/Minproc Sydney
74 2003 Design and Construct 2000 t/h storage and ship loading conveyor system Broad C.S. Geraldton
73 2002 Design and Construct 1600 t/h Ship unloading conveyor system (stage 2 of item 70) Broad C.S. Kwinana
72 2000 Design and Construct Reclaimer with integrated scissors conveyor for Solar Salt at 2000 t/h Onslow Salt Onslow
71 1999 Maintenance Ship loading/unloading conveyors system for sulphur at 1600 t/h FPA Kwinana
70 1998 Design and construct Ship loading/unloading conveyors system for sulphur at 1600 t/h C.C./FPA Kwinana
69 1998 Design
Major redesign of 2500 t/h scraper reclaimer
PWSC  
68 1997 Design Thickeners and Acid/ Floculent Tanks Bulong Nick Gold Fields
67 1997 Design and Construct Shiploading Conveyor System with loading Hopper BPA Bunbury
66 1996 Design and Construct Upgrade of refinery conveyors with discharge ploughs Worsley Al Worsley
65 1995 Design and Construct High wall , Flexowell conveyors reversible Svedala Tarmoola
64 1994 Design and Construct Upgrade of refinery conveyors Worsley Al Worsley
63 1994 Design and Construct Conveyor trusses CBH Northampton
62 1994 Design and Construct 1500 t/h mobile stacker for sugar CCL Glebe Island
61 1994 Design and Construct Train loading system at 3000 m3/h for grains CBH Mingenew
60 1994 Design and Construct Train loading system at 3000 m3/h for grains CBH Mukinbudin
59 1993 Design and Construct Train loading system at 3000 m3/h for grains CBH Kalannie
58 1993 Design and Construct Train loading system at 3000 m3/h for grains CBH Whylketchem
57 1993 Design and Construct Train loading system at 3000 m3/h for grains CBH Hyden
56 1992 Design and Construct Train loading system at 3000 m3/h for grains CBH Brookton
55 1991 Design and Construct Conveyor trusses CBH Nyabing
54 1991 Design and Construct 75T Garner bin CBH Nyabing
53 1991 Design and Construct Grain storage system 21000T, air-supported conveyor (in/outloading) CBH Nyabing
52 1991 Feasibility Study Stacker upgrade from 1500 tph to 2000 t/h Dampier Salt Dampier
51 1990 Design and Construct Underwater Scalping chain conveyor 100 t/h A.M.C. Eneabba
50 1990 Design and Construct 7 off Through Trippers for gantry conveyors 400 t/h CBH
49 1990 Design and Construct Grain storage system 21000T, air-supported conveyor (in/outloading) CBH Northampton
48 1990 Engineering Services Combustion analysis in a charcoal plant Barrack Australind
47 1990 Engineering Services Upgrading of emergency Reclaim system for bauxite Alcoa Wagerup
46 1989 Design and Construct 30000 T Grain Silo with 400 tph reclaim system CBH Esperance
45 1988 Design and Construct Apron feeder spillage conveyors Alcoa Pinjarra
44 1988 Design and Construct Extension and by-pass of bauxite yard conveyor Alcoa Pinjarra
43 1988 Design and Construct Oversize rock clearing system for primary bauxite crusher Alcoa Del Park
42 1988 Feasibility Study Oversize rock clearing system for primary bauxite crusher Alcoa Del Park
41 1988 Design and Construct 1000 t/h Stacker and 800 t/h Scraper Reclaimer for Iron ore M.N.M. Mt.Newman
40 1987 Design and Construct 3000 t/h Feeder breaker for gold bearing ore Waihi Gold Waihi, N.Z.
39 1987 Design and Construct Upgrade of Stockpile system for Iron ore port Robe River CapeLambert
38 1987 Feasibility Study Upgrade of a mobile crusher from 1200 to 1800 t/h. Alcoa Del Park
37 1987 Design and Construct 1500 t/h Feeder breaker for gold bearing ore Boddington G Boddington
36 1987 Engineering and Design Spillage system for overland conveyor Alcoa Pinjarra
35 1986 Engineering and Design Stacker upgrade from 1200 t/h to 3600 t/h Robe River Cape Lambert
34 1986 Design and Construct Upgrading of Coal Crushing and Screening plant to 200 tph. Jacia Collie
33 1986 Design and Construct 5T Derrick Crane for Offshore Platform Woodside N.W. Shelf.
32 1986 Design and Construct Change out of 14 km. belt in 4 days Alcoa Pinjarra
31 1985 Design and Construct 2000 t/h reversible apron feeder Alcoa Pinjarra
30 1985 Design and Construct Modification to 2000 t/h Bridge type B.W.R. Alcoa Wagerup
29 1985 Design and Construct Mobile Conveyor and stacking system for tailings A.D.M. Argyle
28 1985 Design and Construct 1100 t/h continuous mining and handling mobile system Alcoa Pinjarra
27 1985 Feasibility Study into various methods of continuous mining of bauxite ore Alcoa Pinjarra
26 1984 Design and Construct Double stage crushing plant for gold ore at 120 t/h. MPES Porphyry
25 1984 Design and Construct Triple stage crushing and screening plant at 700 t/h. Forrest Gold Tower Hill
24 1984 Design and Construct Upgrading of single barrel Car Dumper to 6000 t/h Robe River Cape Lambert
23 1984 Feasibility Study Conversion of Natural Gas into transport fuels Bond Corp. Perth
22 1984 Engineering Study Stockpile analysis for Limestone Cockburn C Cockburn
21 1984 Design and Construct 3 off 6m reversible apron feeder 2000 t/h Alcoa Pinjarra
20 1983 Engineering Study Stockpile extension at Cape Lambert Robe River Cape Lambert
19 1983 Design and Construct 1000 t/h mobile conveyor system 50m modules Westralian S Capel
18 1983 Design and Construct Complete Inplant conveyor System for bauxite refinery Worsley Al Worsley
17 1982 Design and Construct Coal injection system for a fluid bed Calciner Coates Va Wundowie 
16 1982 Engineering Services Rectification and commission fluid bed calciner for lime K.L.C Kalgoorlie
15 1982 Feasibility Study Direct reduction based mini steel Bond Corp. Weld Range
14 1982 Design and Construct Mobile Crusher 1800/2000 t/h for bauxite Worsley Al Worsley
13 1981 Feasibility Study Utilisation of Tubridgi gas for various processes with cost parameter Cape Range Perth
12 1981 Design and Construct 3 off 500 tph secondary Impact crushers for bauxite Worsley Al Worsley
11 1981 Design and Construct 2200 t/h bridge type Reclaimer for bauxite Alcoa Wagerup
10 1981 Design and Construct 2000 t/h Boom stacker for bauxite Alcoa Wagerup
9 1981 Design and Construct Mobile Crusher 1800/2000 t/h for bauxite Alcoa Wagerup
8 1981 Design and Construct Vacuum belt filters Alcoa Wagerup
7 1981 Design and Construct Two Delkor Belt filters CSBP Kwinana
6 1981 Design and Construct Cropping shear for merchant mill with tempcore line BHP Newcastle
5 1980 Design and Construct Grip tilter for rail finishing line BHP Whyalla
4 1980 Desgin Overland and plant conveyor systems Alcoa Wagerup
3 1980 Design and Construct Ship loader and jetty conveyor Dampier Salt Cape Curvier
2 1979 Feasibility Study Hydromining and transporting of coal in a water catchment area Belambi Coal Belambi
1 1979 Feasibility Study Capacity modelling of Port Dampier with demurrage forecasts Hamersley Dampier