PREVIOUS PROJECTS
No.: | Year: | Description: | Project Details: | Client: | Location: | |
83 | 2009 | Design and Construct | Overland Conveyor System 4km/800t/h | D&Z | Griffin Energy | |
82 | 2008 | Design and Fabricate | Iron Ore Processing Plant | MGM | Extension Hill | |
81 | 2007 | Design and Construct | Radial Stacker (160m/7500t/h) | Worley Parsons | Cloud Break | |
80 | 2006 | Design and Construct | Conveyor System Placement Plant | KHD | Blue Circle Southern | |
79 | 2005 | Construct | Drum and cyclone plant | Kerman C.L. | Bootu Creek | |
78 | 2005 | Supply and Construct | Crushing and screening plant c/w conveyor system | Kerman C.L. | Bootu Creek | |
77 | 2005 | Design and Construct | 1500 t/h stacker/ship loader with yard conveyor | Bootu Creek | Darwin | |
76 | 2004 | Design and Construct | 1000 t/h storage & ship loading conveyor system | Wylie&Skene | Port Hedland | |
75 | 2004 | Supply | Conveyor system for waste recycling plant | GRD/Minproc | Sydney | |
74 | 2003 | Design and Construct | 2000 t/h storage and ship loading conveyor system | Broad C.S. | Geraldton | |
73 | 2002 | Design and Construct | 1600 t/h Ship unloading conveyor system (stage 2 of item 70) | Broad C.S. | Kwinana | |
72 | 2000 | Design and Construct | Reclaimer with integrated scissors conveyor for Solar Salt at 2000 t/h | Onslow Salt | Onslow | |
71 | 1999 | Maintenance | Ship loading/unloading conveyors system for sulphur at 1600 t/h | FPA | Kwinana | |
70 | 1998 | Design and construct | Ship loading/unloading conveyors system for sulphur at 1600 t/h | C.C./FPA | Kwinana | |
69 | 1998 | Design |
|
PWSC | ||
68 | 1997 | Design | Thickeners and Acid/ Floculent Tanks | Bulong Nick | Gold Fields | |
67 | 1997 | Design and Construct | Shiploading Conveyor System with loading Hopper | BPA | Bunbury | |
66 | 1996 | Design and Construct | Upgrade of refinery conveyors with discharge ploughs | Worsley Al | Worsley | |
65 | 1995 | Design and Construct | High wall , Flexowell conveyors reversible | Svedala | Tarmoola | |
64 | 1994 | Design and Construct | Upgrade of refinery conveyors | Worsley Al | Worsley | |
63 | 1994 | Design and Construct | Conveyor trusses | CBH | Northampton | |
62 | 1994 | Design and Construct | 1500 t/h mobile stacker for sugar | CCL | Glebe Island | |
61 | 1994 | Design and Construct | Train loading system at 3000 m3/h for grains | CBH | Mingenew | |
60 | 1994 | Design and Construct | Train loading system at 3000 m3/h for grains | CBH | Mukinbudin | |
59 | 1993 | Design and Construct | Train loading system at 3000 m3/h for grains | CBH | Kalannie | |
58 | 1993 | Design and Construct | Train loading system at 3000 m3/h for grains | CBH | Whylketchem | |
57 | 1993 | Design and Construct | Train loading system at 3000 m3/h for grains | CBH | Hyden | |
56 | 1992 | Design and Construct | Train loading system at 3000 m3/h for grains | CBH | Brookton | |
55 | 1991 | Design and Construct | Conveyor trusses | CBH | Nyabing | |
54 | 1991 | Design and Construct | 75T Garner bin | CBH | Nyabing | |
53 | 1991 | Design and Construct | Grain storage system 21000T, air-supported conveyor (in/outloading) | CBH | Nyabing | |
52 | 1991 | Feasibility Study | Stacker upgrade from 1500 tph to 2000 t/h | Dampier Salt | Dampier | |
51 | 1990 | Design and Construct | Underwater Scalping chain conveyor 100 t/h | A.M.C. | Eneabba | |
50 | 1990 | Design and Construct | 7 off Through Trippers for gantry conveyors 400 t/h | CBH | - | |
49 | 1990 | Design and Construct | Grain storage system 21000T, air-supported conveyor (in/outloading) | CBH | Northampton | |
48 | 1990 | Engineering Services | Combustion analysis in a charcoal plant | Barrack | Australind | |
47 | 1990 | Engineering Services | Upgrading of emergency Reclaim system for bauxite | Alcoa | Wagerup | |
46 | 1989 | Design and Construct | 30000 T Grain Silo with 400 tph reclaim system | CBH | Esperance | |
45 | 1988 | Design and Construct | Apron feeder spillage conveyors | Alcoa | Pinjarra | |
44 | 1988 | Design and Construct | Extension and by-pass of bauxite yard conveyor | Alcoa | Pinjarra | |
43 | 1988 | Design and Construct | Oversize rock clearing system for primary bauxite crusher | Alcoa | Del Park | |
42 | 1988 | Feasibility Study | Oversize rock clearing system for primary bauxite crusher | Alcoa | Del Park | |
41 | 1988 | Design and Construct | 1000 t/h Stacker and 800 t/h Scraper Reclaimer for Iron ore | M.N.M. | Mt.Newman | |
40 | 1987 | Design and Construct | 3000 t/h Feeder breaker for gold bearing ore | Waihi Gold | Waihi, N.Z. | |
39 | 1987 | Design and Construct | Upgrade of Stockpile system for Iron ore port | Robe River | CapeLambert | |
38 | 1987 | Feasibility Study | Upgrade of a mobile crusher from 1200 to 1800 t/h. | Alcoa | Del Park | |
37 | 1987 | Design and Construct | 1500 t/h Feeder breaker for gold bearing ore | Boddington G | Boddington | |
36 | 1987 | Engineering and Design | Spillage system for overland conveyor | Alcoa | Pinjarra | |
35 | 1986 | Engineering and Design | Stacker upgrade from 1200 t/h to 3600 t/h | Robe River | Cape Lambert | |
34 | 1986 | Design and Construct | Upgrading of Coal Crushing and Screening plant to 200 tph. | Jacia | Collie | |
33 | 1986 | Design and Construct | 5T Derrick Crane for Offshore Platform | Woodside | N.W. Shelf. | |
32 | 1986 | Design and Construct | Change out of 14 km. belt in 4 days | Alcoa | Pinjarra | |
31 | 1985 | Design and Construct | 2000 t/h reversible apron feeder | Alcoa | Pinjarra | |
30 | 1985 | Design and Construct | Modification to 2000 t/h Bridge type B.W.R. | Alcoa | Wagerup | |
29 | 1985 | Design and Construct | Mobile Conveyor and stacking system for tailings | A.D.M. | Argyle | |
28 | 1985 | Design and Construct | 1100 t/h continuous mining and handling mobile system | Alcoa | Pinjarra | |
27 | 1985 | Feasibility Study | into various methods of continuous mining of bauxite ore | Alcoa | Pinjarra | |
26 | 1984 | Design and Construct | Double stage crushing plant for gold ore at 120 t/h. | MPES | Porphyry | |
25 | 1984 | Design and Construct | Triple stage crushing and screening plant at 700 t/h. | Forrest Gold | Tower Hill | |
24 | 1984 | Design and Construct | Upgrading of single barrel Car Dumper to 6000 t/h | Robe River | Cape Lambert | |
23 | 1984 | Feasibility Study | Conversion of Natural Gas into transport fuels | Bond Corp. | Perth | |
22 | 1984 | Engineering Study | Stockpile analysis for Limestone | Cockburn C | Cockburn | |
21 | 1984 | Design and Construct | 3 off 6m reversible apron feeder 2000 t/h | Alcoa | Pinjarra | |
20 | 1983 | Engineering Study | Stockpile extension at Cape Lambert | Robe River | Cape Lambert | |
19 | 1983 | Design and Construct | 1000 t/h mobile conveyor system 50m modules | Westralian S | Capel | |
18 | 1983 | Design and Construct | Complete Inplant conveyor System for bauxite refinery | Worsley Al | Worsley | |
17 | 1982 | Design and Construct | Coal injection system for a fluid bed Calciner | Coates Va | Wundowie | |
16 | 1982 | Engineering Services | Rectification and commission fluid bed calciner for lime | K.L.C | Kalgoorlie | |
15 | 1982 | Feasibility Study | Direct reduction based mini steel | Bond Corp. | Weld Range | |
14 | 1982 | Design and Construct | Mobile Crusher 1800/2000 t/h for bauxite | Worsley Al | Worsley | |
13 | 1981 | Feasibility Study | Utilisation of Tubridgi gas for various processes with cost parameter | Cape Range | Perth | |
12 | 1981 | Design and Construct | 3 off 500 tph secondary Impact crushers for bauxite | Worsley Al | Worsley | |
11 | 1981 | Design and Construct | 2200 t/h bridge type Reclaimer for bauxite | Alcoa | Wagerup | |
10 | 1981 | Design and Construct | 2000 t/h Boom stacker for bauxite | Alcoa | Wagerup | |
9 | 1981 | Design and Construct | Mobile Crusher 1800/2000 t/h for bauxite | Alcoa | Wagerup | |
8 | 1981 | Design and Construct | Vacuum belt filters | Alcoa | Wagerup | |
7 | 1981 | Design and Construct | Two Delkor Belt filters | CSBP | Kwinana | |
6 | 1981 | Design and Construct | Cropping shear for merchant mill with tempcore line | BHP | Newcastle | |
5 | 1980 | Design and Construct | Grip tilter for rail finishing line | BHP | Whyalla | |
4 | 1980 | Desgin | Overland and plant conveyor systems | Alcoa | Wagerup | |
3 | 1980 | Design and Construct | Ship loader and jetty conveyor | Dampier Salt | Cape Curvier | |
2 | 1979 | Feasibility Study | Hydromining and transporting of coal in a water catchment area | Belambi Coal | Belambi | |
1 | 1979 | Feasibility Study | Capacity modelling of Port Dampier with demurrage forecasts | Hamersley | Dampier |